Mode:         
Saturday, March 23, 2019

Get Adobe Flash player

Enter Title

    In preparation of MDOT paving Route One from the spur to the Ogunquit Town line, the YWD was  required to lower an existing 16” watermain to make room so that MDOT could replace a 24” CMP (corrugated metal pipe) with a 48” RCP (reinforced concrete pipe).

 

In addition crews worked to locate and breakout all gate valves as well.

 

 

 

 

DNNspot-Rotator

  
York Water District 86 Woodbridge Road PO Box 447 York Maine 03909 207-363-2265